Ministry of Energy of the Republic of Belarus
Project name
Project cost (mln $ USD)
Term of realization / term of recoupment (years)
Introduction of steam and gas technologies at Mozyr HPP
70.0
-/ 8,4
Reconstruction of the substation 330/110/10 kV «Minsk-Severnaya» in Minsk
24.0
4 /-
Bereza State District Power Plant. Installation of 400 MW power generating unit on a new site.
500.0
4 / 15
Mogilev Heat Power Plant. Reconstruction of turbines № 2 and 3, Automatic Control System with the installation of 110 MW gas turbine
198.0
-/ 11,6
Construction of Vitebsk hydro-electric power station on the Western Dvina river
230.0
3 / 20
Construction of Nemnovskaya hydro power station on the river Neman
139.0
4 / 27
Сonstruction of 920 MW Coal Condensation Electric Power Station Zelvenskaya
1311
-/ 12
Lukoml State District Power Plant(SDPP). Installation of 400 MW generating unit on a new site.
500.0
4/ -
©
Министерство экономики Республики Беларусь
При использовании материалов сайта ссылка на источник обязательна
Информационная поддержка -
Пресс-служба Министерства экономики Республики Беларусь
Техническая поддержка -
НИЭИ Минэкономики