A. Project Opportunity Description:
A1. Project Name:
a. Short name:
Lukoml State District Power Plant(SDPP). Installation of 400 MW generating unit on a new site.
b. Full name:
Lukoml State District Power Plant(SDPP). Installation of 400 MW generating unit on a new site.
c. Summary description:
The new 400 MW power generating unit with coefficient of efficiency not less than 57% is planned as an independent object using existing infrastructure of Lukoml State District Power Plant
A2. Progress Status:
Preliminary development of the project
A3. Organizations involved and their roles:
1) Development – will be defined by bidding for construction of a “key-turn” object 2) SPU «Belenergo» (RUP «Vitebskenergo»)- implementation 3) Ministry of Energy of the Republic of Belarus- coordinator
A4. Project Description:
Installation of the combined cycle power unit of 400 MW capacity category unit with coefficient of efficiency not less than 57% is planned as an independent object using the existing infrastructure of Lukoml State District Power Plant, regarding engineering networks of water supply, sewerage, repair and storage rooms and services. The main fuel for gas and steam combined unit - natural gas, the emergency fuel - diesel fuel. Distribution of electric capacity is envisaged into an extensible part of outdoor switchgear - 330 kV
a. Project cost (mln USD):
500.0
A5. Background / history / overall programme / related or similar projects:
The republican unitary enterprise (RUP) «Vitebskenergo» was set up in 1963. The energy system includes the Lukoml state district power station, Novopolotsk heat and power plant, Vitebsk heat and power plant, Belarusian state district electric station, Orsha heat and power plant, Polotsk heat and power plant, Eastern modular heat and power plant, Vitebsk and regional networks. The installed electric power of RUP «Vitebskenergo» is 3135.6 МW. The length of heat networks is 716?3 km. The length of electric networks is 50,7 thousand km.
A6. Environmental impact summary:
Environmental impact is not evaluated.
A7. Possible obstacles/ problems/ risk assessment:
High grade of stability
A8. Term of realization / term of recoupment:
4/ -
A9. Project’s branch:
Electroenergetics

B. Capital Cost Items (additional requirements for project):
B1. Project physical components B2. Capital cost (mln USD)
Equipment (Germany, Russia, China) + civil and installation works: 500.0
B3. Sub-projects by location B4. Project cost (mln USD)

C. Capital Resources Available from Sponsors/ Proposers:
C1. Resources 'in kind', grants, investments, equity / ownership, etc. C2. Amount (mln USD)

D. Required Financial Assistance:
D1. Financing gaps, type of financial assistance required:
Loan or direct investment
D2. Sources of finance D3. Type of investment D4. Amount (mln USD)
Foreign investor’s funds: Loan or direct investment 500.0
D5. Financial/ International Institution Name:
Not available

E. Demand (users) and revenues:
E1. Type of users/ markets, volumes, pricing, revenues, quantifiable benefits/ savings:
Export of electric power is envisaged.
E2. Revenues (Sales) E3. Amount (mln USD)

F. Operating and Maintenance Costs:
F1. Cost components, strategies for cost recovery, operating organisations, subsidies, etc.:
F2. Cost Item F3. Amount (mln USD)

G. Net Income Value:
G1. Net Income Value G2. Amount (mln USD):

H. Источник информации о проекте:
H1. This form was completed by:
Vitaly Sobko, Head of Development Department
H2. Organisation (address):
SPU «Belenergo»: 14, K. Marx str., 220030 Minsk, Republic of Belarus
H3. Tel/Fax/E-mail:
Tel: +375-17 2182340, fax: +375-17 2182639; e-mail: sobko@bel.energo.net.by
H4. Date:
September, 2010
H5. H5. Supreme Organization:
Ministry of Energy of the Republic of Belarus