| Русская версия |
|
| A1.
Project Name:
|
|
|
| a.
Short name:
|
| Installation of 400 MW power generating unit on a new site |
| b.
Full name:
|
| Bereza State District Power Plant. Installation of 400 MW power generating unit on a new site. |
| c.
Summary description:
|
| Installation of the combined-cycle power unit of 400 MW capacity category consisting of two gas turbines of 150 MW capacity category, two heat-recovery boilers and steam turbine of 150 МW capacity category.
|
| A2.
Progress Status:
|
| Feasibility study has been developed.
|
| A3.
Organizations involved and their roles:
|
| 1) RUP «Belnipienergoprom» – development 2) State Production Unit «Belenergo» (RUP «Brestenergo»– implementation 3) Ministry of Energy of the Republic of Belarus - сoordinator
|
| A4.
Project Description:
|
| The project involves: installation of the combined cycle 400 MW of heat-recovery type consisting of two gas turbines V-94.2, two heat-recovery boilers and one steam turbine of the type K-150-7.5.
|
| a.
Project cost (mln USD):
|
| 500.0 |
| A5.
Background / history / overall programme / related or similar projects:
|
| The enterprise was established in 1962.
RUP «Brestenergo» consists of Bereza State District Power Plant, Brest Heat and Power Plant, Pinsk Heat and Power Plant, Baranovichi Heat and Power Plant, Heat and Power Plant «Zapadnaya» in Pinsk, district boiler installations «BPK-1», «BPK-2» and Severnaya PK, as well as Brest regional and district heating and power networks.
The installed electric capacity of RUP «Brestenergo» power system is 1105 MW. The heat network length is 382 km, electric power network - 37 thousand km.
|
| A6.
Environmental impact summary:
|
| Reduction of harmful substances emissions into the environment.
|
| A7.
Possible obstacles/ problems/ risk assessment:
|
| Good grade of stability.
|
| A8.
Term of realization / term of recoupment:
|
| 4 / 15
|
| A9.
Project’s branch:
|
| Electroenergetics
|
|
| B1. Project physical components |
B2. Capital cost (mln USD) |
| Equipment (Germany, Russia) + civil works: |
500.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
| B3. Sub-projects by location |
B4. Project cost (mln USD) |
|
|
|
|
|
|
|
|
|
| C1. Resources 'in kind', grants, investments, equity / ownership, etc. |
C2. Amount (mln USD) |
|
|
|
|
|
|
|
|
|
|
|
|
|
| D1.
Financing gaps, type of financial assistance required:
|
| Direct investment or loan
|
| D2. Sources of finance |
D3. Type of investment |
D4. Amount (mln USD) |
| Foreign investor’s funds: |
Foreign direct investment or credit: |
500.0 |
|
|
|
|
|
|
|
|
|
| D5.
Financial/ International Institution Name:
|
|
|
|
| E1.
Type of users/ markets, volumes, pricing, revenues, quantifiable benefits/ savings:
|
| Export of electric power is envisaged.
|
| E2. Revenues (Sales) |
E3. Amount (mln USD) |
|
|
|
|
|
|
|
|
|
|
|
| F1.
Cost components, strategies for cost recovery, operating organisations, subsidies, etc.:
|
|
|
| F2. Cost Item |
F3. Amount (mln USD) |
| Heat, water, amortization, labor cost, taxes, etc. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| G1. Net Income Value |
G2. Amount (mln USD): |
|
|
|
|
|
|
|
|
|
|
|
| H1.
This form was completed by:
|
| Vitaly Sobko, Head of Perspective Department
|
| H2.
Organisation (address):
|
| SPU «Belenergo», 14 K. Marx St., 220030 Minsk, Republic of Belarus
|
| H3.
Tel/Fax/E-mail:
|
| Tel.: +375 17 2182043, fax: +375 17 2182639; e-mail: sobko@bel.energo.net.by
|
| H4.
Date:
|
| September, 2010
|
| H5.
H5. Supreme Organization:
|
| Ministry of Energy of the Republic of Belarus
|
|
|