| Русская версия |
|
| A1.
Project Name:
|
|
|
| a.
Short name:
|
| Reconstruction of the substation «Minsk-Severnaya» |
| b.
Full name:
|
| Reconstruction of the substation 330/110/10 kV «Minsk-Severnaya» in Minsk |
| c.
Summary description:
|
| Reconstruction of the existing substation with the warn out equipment |
| A2.
Progress Status:
|
| Feasibility study is developed. Architectural project is being developed.
|
| A3.
Organizations involved and their roles:
|
| 1) Development: RUP «Belenergosetproect»
2) Implementation: State Production Association «Belenergo» (RUP «Minskenergo») 3) Coordinator: Ministry of Energy of the Republic of Belarus
|
| A4.
Project Description:
|
| The following works should be done at the substation:
- dismantling of two autotransformers with the subsequent installation of two autotransformers with 200 MVA capacity 330/220/10 kV voltage;
- full replacement of the open 330 and 110 kV switchgear with 330 and 110 кV
gas-insulated breakers;
- installation of new modern direct current shields and storage batteries;
- dismantling of the compressor station and airways;
- reconstruction of the ground loop;
- transfer of 10 kV cable lines from the old closed switchgear to the new one;
- installation of a security signal system along the perimeter of the substation;
- replacement of the worn out equipment at the communication center;
- full replacement of existing analog protection systems for the digital ones;
- development and implementation of the automatic control system for the technological process at the substation;
- the suspension of fibre optic cable built in the overhead ground-wire cable at the existing 110 kV air-line 110 for the organization of communication channels and telemechanics to transfer the increased volume of information and to control and connect the monitoring protection systems at Minsk HPS-4, National Power Control Centre of Belarus, Central Dispatching Service of Minskenergo, Central Dispatching Service of Minsk electric networks.
|
| a.
Project cost (mln USD):
|
| 24.0 |
| A5.
Background / history / overall programme / related or similar projects:
|
| The facility RUP «Minskenergo» was established in 1963. It involves Minsk Hydro Power Station (HPS-2), Minsk HPS-3, Minsk HPS-4, Minsk HPS-5, Zhodinskaya HPS, Minsk heating networks and regional electric networks. The installed electric power of Minskenergo is - 1814 MW. The length of heating networks is 2585 km. The length of electric networks is more, than 60 thousand km.
The start of the project is somewhere in 2007. Financing is to be made from own and borrowed funds. The suppliers preferred: from Germany, France, Sweden, Russia and China
.
|
| A6.
Environmental impact summary:
|
| Ecological project expertise is absent.
|
| A7.
Possible obstacles/ problems/ risk assessment:
|
| It is not estimated
|
| A8.
Term of realization / term of recoupment:
|
| 4 /-
|
| A9.
Project’s branch:
|
| Electroenergetics
|
|
| B1. Project physical components |
B2. Capital cost (mln USD) |
| Equipment (Germany, France, Russia, China) + construction and installation |
24.0 |
| Total: |
24.0 |
|
|
|
|
|
|
|
|
|
|
|
|
| |
| B3. Sub-projects by location |
B4. Project cost (mln USD) |
|
|
|
|
|
|
|
|
|
| C1. Resources 'in kind', grants, investments, equity / ownership, etc. |
C2. Amount (mln USD) |
| Own funds: |
12.0 |
|
|
|
|
|
|
|
|
|
|
|
| D1.
Financing gaps, type of financial assistance required:
|
| Loan
|
| D2. Sources of finance |
D3. Type of investment |
D4. Amount (mln USD) |
| Foreign investment funds: |
Credit |
12.0 |
|
|
|
|
|
|
|
|
|
| D5.
Financial/ International Institution Name:
|
| Not available
|
|
| E1.
Type of users/ markets, volumes, pricing, revenues, quantifiable benefits/ savings:
|
| Supply of industrial enterprises and housing with electric power in Minsk city
|
| E2. Revenues (Sales) |
E3. Amount (mln USD) |
|
|
|
|
|
|
|
|
|
|
|
| F1.
Cost components, strategies for cost recovery, operating organisations, subsidies, etc.:
|
| It is not estimated
|
| F2. Cost Item |
F3. Amount (mln USD) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| G1. Net Income Value |
G2. Amount (mln USD): |
|
|
|
|
|
|
|
|
|
|
|
| H1.
This form was completed by:
|
| Vitaly Sobko, Head of Perspective Department
|
| H2.
Organisation (address):
|
| SPU «Belenergo», 14, K. Marx str., Minsk, 220030, Republic of Belarus
|
| H3.
Tel/Fax/E-mail:
|
| Tel.: +375 17 2182043, fax: +375 17 2182639; e-mail: sobko@bel.energo.net.by
|
| H4.
Date:
|
| September, 2010
|
| H5.
H5. Supreme Organization:
|
| Ministry of Energy of the Republic of Belarus
|
|
|