Project Name:
|
|
|
| a.
Short name:
|
| Construction of Vitebsk hydro-electric power station on the Western Dvina river |
| b.
Full name:
|
| Construction of Vitebsk hydro-electric power station on the Western Dvina river |
| c.
Summary description:
|
| Construction of a hydro-electric power station on the Western Dvina river |
| A2.
Progress Status:
|
| Feasibility study is in progress
|
| A3.
Organizations involved and their roles:
|
| 1) RUP «Belnipienergoprom» - development 2) State Production Association «Belenergo» (RUP «Vitebskenergo») - implementation 3) Ministry of Energy of the Republic of Belarus - сoordinator
|
| A4.
Project Description:
|
| The project involves construction of an inundated-type waterworks facility, a building of a hydro-electric power station with an enclosed turbine chamber, a reinforced-concrete overflow dam with flat sectional water-gates to discharge floodwater, a single-chamber shipping lock to ensure navigation on the river. The power station will have the following parameters: installed power – 50 MW; maximum operating pool elevation - 140 m; designed head - 14 m. An open distribution system with SF6 circuit breakers for 110 кW will be constructed in the building of the closed distribution system with a distribution device of 6kW of the hydro-electric power station to release into the energy system the electrical energy produced.
The approximate date to launch the project: 2011; funding: budgetary funds, resources of the enterprise, direct investment, loan.
|
| a.
Project cost (mln USD):
|
| 230.0 |
| A5.
Background / history / overall programme / related or similar projects:
|
| The republican unitary enterprise «Vitebskenergo» was set up in 1963. The energy system includes the Lukoml state district electric station, Novopolotsk heat and power plant, Vitebsk heat and power plant, Belarusian state district electric station, Orsha heat and power plant, Polotsk heat and power plant, Eastern modular heat and power plant, the town of Vitebsk, Vitebsk regional and district networks. The installed electric power of the republican unitary enterprise «Vitebskenergo» is 3105.5 МW. The length of heat networks is 576 km. The length of electric networks is more than 50 thousand km.
|
| A6.
Environmental impact summary:
|
| Impact is observed, but without harmful emissions
|
| A7.
Possible obstacles/ problems/ risk assessment:
|
| The project is characterized by a good grade of stability
|
| A8.
Term of realization / term of recoupment:
|
| 3 / 20
|
| A9.
Project’s branch:
|
| Electroenergetics
|
|
| B1. Project physical components |
B2. Capital cost (mln USD) |
| Equipment (Checks Republic, Germany, China) + construction works |
230.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
| B3. Sub-projects by location |
B4. Project cost (mln USD) |
|
|
|
|
|
|
|
|
|
| C1. Resources 'in kind', grants, investments, equity / ownership, etc. |
C2. Amount (mln USD) |
|
|
|
|
|
|
|
|
|
|
|
|
|
| D1.
Financing gaps, type of financial assistance required:
|
| Investment, equity/ownership
|
| D2. Sources of finance |
D3. Type of investment |
D4. Amount (mln USD) |
| Foreign investment: |
Project financing by BOO, BOT scheme, direct investment |
230.0 |
|
|
|
|
|
|
|
|
|
| D5.
Financial/ International Institution Name:
|
|
|
|
| E1.
Type of users/ markets, volumes, pricing, revenues, quantifiable benefits/ savings:
|
| Production of electric energy with water resources of the Western Dvina river for partially covering the burden of Vitebsk energy system
|
| E2. Revenues (Sales) |
E3. Amount (mln USD) |
|
|
|
|
|
|
|
|
|
|
|
| F1.
Cost components, strategies for cost recovery, operating organisations, subsidies, etc.:
|
|
|
| F2. Cost Item |
F3. Amount (mln USD) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| G1. Net Income Value |
G2. Amount (mln USD): |
|
|
|
|
|
|
|
|
|
|
|
| H1.
This form was completed by:
|
| Vitaly Sobko, Head of Perspective Department
|
| H2.
Organisation (address):
|
| SPU «Belenergo», 14, K. Marx street, 220030, Minsk, Republic of Belarus
|
| H3.
Tel/Fax/E-mail:
|
| Tel.: +375 17 2182043, fax: +375 17 2182639; e-mail: sobko@bel.energo.net.by
|
| H4.
Date:
|
| September, 2010
|
| H5.
H5. Supreme Organization:
|
| Ministry of Energy of the Republic of Belarus
|
|
|